Reklam
Reklam
Reklam
Reklam
Reklam

Tender with engine failure towed back to yard in Elsfleth

After having just been overhauled for 7,4 Million Euro at the Shipyard Elsfleth, the engine of the 'Werra' failed

Tender with engine failure towed back to yard in Elsfleth

After having just been overhauled for 7,4 Million Euro at the Shipyard Elsfleth, the engine of the 'Werra' failed

Tender with engine failure towed back to yard in Elsfleth
30 September 2018 - 17:49

After having just been overhauled for 7,4 Million Euro at the Shipyard Elsfleth, the engine of the 'Werra' failed. On Sep 30, 2018, the ship was towed by the tugs 'Holtenau' and 'Lütje Hörn' from Kiel back to Elsfleth. German report with photo: www.kn-online.de/...

This news 1674 hits received.

COMMENTS

  • 0 Comment