Inconsistency of main engine remote control
The crew of the 'Cape Dawson' observed an inconsistency in the main engine remote control operations during a pre-arrival test at Montreal on June 6, 2018, but the back up system was fully operational

09 June 2018 - 19:14
The crew of the 'Cape Dawson' observed an inconsistency in the main engine remote control operations during a pre-arrival test at Montreal on June 6, 2018, but the back up system was fully operational. The decision was taken to stop the vessel and to finalize system-checks to full Class satisfaction. This was not an emergency situation, but part of normal routine.
This news 936 hits received.
COMMENTS