SeaNews Türkiye - Maritime Intelligence
    ports

    Charleston port receives 3 new quay cranes to handle 14,000+ TEU ships

    December 10, 2025
    SeaNews
    33 views
    Share:
    Charleston port receives 3 new quay cranes to handle 14,000+ TEU ships
    Archive Photo

    THE South Carolina Ports Authority has taken delivery of three additional ship-to-shore cranes with 155 feet of lift height that are to be installed at the port of Charleston, as part of a drive to further modernise operations, boost berth productivity and upgrade infrastructure to handle larger ships

    THE South Carolina Ports Authority has taken delivery of three additional ship-to-shore cranes with 155 feet of lift height that are to be installed at the port of Charleston, as part of a drive to further modernise operations, boost berth productivity and upgrade infrastructure to handle larger ships. The cranes arrived onboard the Zhen Hua 28 vessel after a two-month journey from China. Shanghai Zhenhua Heavy Industries (ZPMC) manufactured them.

    The cranes will be deployed at the Wando Welch Terminal in Mount Pleasant. The new cranes will be assembled and commissioned behind the wharf, and later moved to begin working ships at the terminal in early 2020.

    The Wando Welch Terminal currently has 12 ship-to-shore cranes; eight have 155 feet of lift height and four have 115 feet of lift height.

    The three new cranes will replace three of the existing cranes, which will move to the North Charleston Terminal, meaning Wando Welch Terminal will have 11 cranes with 155 feet of lift height and one crane with 115 feet of lift height in 2020.

    The port authority will receive four additional cranes with 155 feet of lift height in 2020 for a total of 15 such cranes operating at Wando Welch Terminal by the end of 2020.

    'These modern cranes are incredibly tall and have a wider reach, enabling crane operators to seamlessly move containers back and forth on 14,000-TEU+ vessels,' said SCPA chief operations officer Barbara Melvin.

    SCPA's infrastructure investments, combined with the ongoing Charleston harbour deepening project, will enable Wando Welch Terminal to handle three 14,000 TEU ships simultaneously next year.

    WORLD SHIPPING

    © Copyright SeaNews

    Comments (0)

    Leave a Comment

    Your comment will be reviewed before publishing.

    SeaNews Türkiye - Maritime Intelligence

    The leading source for global maritime news, shipping intelligence, and logistics analysis. Connecting the oceans of information.

    Lojiturk - Kamer Sokak No: 12/1
    Küçüksu Kandilli 34684
    Üsküdar/İstanbul, TÜRKİYE

    Popular

    • Check back soon...

    Newsletter

    Subscribe to our daily briefing and never miss a headline from the maritime world.

    You can unsubscribe at any time. Privacy Policy

    © 2025 SeaNews Turkey. All rights reserved.