SeaNews Türkiye - Maritime Intelligence
    ports

    Virginia port sees record box traffic in August; expansion makes progress

    December 10, 2025
    SeaNews
    14 views
    Share:
    Virginia port sees record box traffic in August; expansion makes progress
    Archive Photo

    THE Port of Virginia's container throughput rose by eight per cent year on year in August to a record 258,821 TEU

    THE Port of Virginia's container throughput rose by eight per cent year on year in August to a record 258,821 TEU. 'August was the second most productive month in our history and in the first two months of fiscal year 2019 our TEU volume has increased by more than 36,600 units, or about eight per cent (compared with FY18),' said Virginia Port Authority CEO John Reinhart, reported the American Journal of Transportation.

    'In addition to peak season volumes, we are seeing some inbound cargo that is moving in anticipation of expanded tariffs on select imports. Overall, our team from Virginia Inland port to Richmond to the Norfolk harbour handled the volume with efficiency and performed well.'

    August's growth was driven by exports: loaded exports increased by 11 per cent while import volumes rose by 3.4 per cent. The port's inland operations also grew, as volumes at Virginia Inland port (VIP) and Richmond Marine Terminal (RMT) were up 21 per cent and 58 per cent, respectively.

    Truck volume grew by five per cent, rail was up 10 per cent and total barge volume rose by 27 per cent.

    Mr Reinhart said as the port expands its container handling capacity and capability at Virginia International Gateway (VIG) and Norfolk International Terminals (NIT), volumes, efficiency and service levels will rise.

    At Virginia International Gateway all 26 of the new rail-mounted gantry cranes have been delivered and the operations team is testing the equipment and preparing to bring it into service.

    'The last stack at VIG comes online at VIG in January 2019 but all others will be operational by October,' said Mr Reinhart.

    'At NIT we took delivery of six more RMGs this past weekend [September 8-9] and the first stack is on schedule to be completed the end of September. We're making significant progress and are tracking for completion of work at VIG by early summer 2019 and summer 2020 for NIT.'

    © Copyright SeaNews

    Comments (0)

    Leave a Comment

    Your comment will be reviewed before publishing.

    SeaNews Türkiye - Maritime Intelligence

    The leading source for global maritime news, shipping intelligence, and logistics analysis. Connecting the oceans of information.

    Lojiturk - Kamer Sokak No: 12/1
    Küçüksu Kandilli 34684
    Üsküdar/İstanbul, TÜRKİYE

    Popular

    • Check back soon...

    Newsletter

    Subscribe to our daily briefing and never miss a headline from the maritime world.

    You can unsubscribe at any time. Privacy Policy

    © 2025 SeaNews Turkey. All rights reserved.