SeaNews Türkiye - Maritime Intelligence
    ports

    Panama Canal Authority finishes work on Pacific side's 3rd lock channel

    SeaNews
    10,655 views
    Share:
    Panama Canal Authority finishes work on Pacific side's 3rd lock channel
    Archive Photo

    THE Panama Canal Authority has completed work on the new access channel for the expanded canal section south of the Centennial Bridge in the Panama Canal

    Panama Canal Authority finishes work on Pacific side's 3rd lock channel THE Panama Canal Authority has completed work on the new access channel for the expanded canal section south of the Centennial Bridge in the Panama Canal, a few metres from Pedro Miguel Locks.

    The new access channel will join the third set of locks with the Culebra Cut.

    After two years, the excavation and dredging work was completed in October. Four million cubic metres of material were removed from the site to become the entrance for neopanamax vessels on the Pacific side, reports GAC port news.

    © Copyright SeaNews

    Comments (0)

    Leave a Comment

    Your comment will be reviewed before publishing.

    SeaNews Türkiye - Maritime Intelligence

    The leading source for global maritime news, shipping intelligence, and logistics analysis. Connecting the oceans of information.

    Lojiturk - Kamer Sokak No: 12/1
    Küçüksu Kandilli 34684
    Üsküdar/İstanbul, TÜRKİYE

    Popular

    • Check back soon...

    Newsletter

    Subscribe to our daily briefing and never miss a headline from the maritime world.

    You can unsubscribe at any time. Privacy Policy

    © 2025 SeaNews Turkey. All rights reserved.