Disabled Tina C towed to Vigo
The "Tina C", loaded with clay suffered engine failure enroute from Plymouth to Gibraltar on July 20, 2017. The tug "Ría de Vigo" was deployed to assist and towed the ship which was adrift at the height of Camariñas, to Vigo where it berthed at 1 p.m. Repairs were expected to take about four days.





