Military Times (blog)Public rationales for unanticipatedshipbuildingcostsMilitary Times (blog)A 945-ton superlift is lowered into place near the stern of PCU Gerald R. Ford, or CVN-78, on May 21, 2011, at Newport NewsShipbuildingin Newport News, Va. The superlift erected contained a diesel generator room, a pump room, an oily water waste pump...US Navy Tries To Rein In Carrier CostsDefenseNews.com (subscription)all 2 news articles »
SHIPBUILDING
21 February 2012 - 13:24
Public rationales for unanticipated shipbuilding costs - Military Times (blog)
Military Times (blog)Public rationales for unanticipatedshipbuildingcostsMilitary Times (blog)A 945-ton superlift is lowered into place near the stern of PCU Gerald R. Ford, or CVN-78, on May 21, 2011, at Newport NewsShipbuildingin Newport News, Va. The superlift erected contained a diesel generator room, a pump room, an oily water waste pump...US Navy Tries To Rein In Carrier CostsDefenseNews.com (subscription)all 2 news articles »
SHIPBUILDING
21 February 2012 - 13:24
This news 906 hits received.
These news may also interest you