Transportation Minister Yildirim watched wind tunnel test for Izmit Bay Crossing and said that the bridge was not affected by strong winds up to 230 km/h.
Transportation Minister Yildirim watched wind tunnel test for Izmit Bay Crossing and said that the bridge was not affected by strong winds up to 230 km/h.






