SeaNews Türkiye - Maritime Intelligence
    ports

    PSA and DP World in line for major port projects in Chittagong

    July 6, 2020
    SeaNews
    846 views
    Share:
    PSA and DP World in line for major port projects in Chittagong
    Archive Photo

    TWO global port operators - Singapore's PSA and Saudi Arabia's Red Sea Gateway Terminal (RSGT) - have been shortlisted to build Bay Terminal, a 12-metre draught facility near Chittagong port

    TWO global port operators - Singapore's PSA and Saudi Arabia's Red Sea Gateway Terminal (RSGT) - have been shortlisted to build Bay Terminal, a 12-metre draught facility near Chittagong port. At the same time, RSGT and DP World are on the priority list for operating the under-construction Patenga Container Terminal, which will raise Chittagong port's container handling capacity significantly.

    The Bangladeshi government is keen to enhance goods capacity of the country's prime seaport, which frequently faces acute congestion.

    'We are in talks with these foreign companies. An agreement will be signed after the negotiation is completed,' a senior shipping ministry official said.

    Bay Terminal will be built nearly 10 miles north of the estuary and will comprise one 1,500-metre multipurpose terminal, one 1,225-metre container terminal and two 830-metre container terminals. It will have 13 jetties and accommodate vessels of up to the 280 metres long. The construction cost is estimated at US$2.5 billion.

    Currently, vessels with a 9.5-metre draught can dock at Chittagong during high tide - Bay Terminal's location nearer the sea will allow vessels to be able to berth independent of tides.

    Sources say the government's Public-Private Partnership Authority is in talks with PSA Singapore on technical, financial, and legal issues. The Singaporean company may be involved in capital dredging, building a breakwater in the bay and building container terminals, except the multipurpose facility.

    Several other companies, from China, India, Korea, and the Middle East, have expressed interest in investing in Bay Terminal construction, but until now PSA Singapore and RSGT are in pole position, confirmed an official, reports London's Loadstar.

    Meanwhile, the government has engaged the engineering corps of the Bangladesh Army for construction of the Patenga Container Terminal, a 600-metre long facility with a back-up area of 26 acres and three berths with 9.5 metres of depth alongside. The $235 million terminal be able to handle 360,000 TEU annually.

    With RSGT and DP World on the priority list, if successful, they would be the first foreign companies to operate ports and terminals in Bangladesh.

    Chittagong has a designed handling capacity of 1.7 million TEU, but last year handled 3.1 million TEU.

    SeaNews Turkey

    © Copyright SeaNews

    Comments (0)

    Leave a Comment

    Your comment will be reviewed before publishing.

    SeaNews Türkiye - Maritime Intelligence

    The leading source for global maritime news, shipping intelligence, and logistics analysis. Connecting the oceans of information.

    Lojiturk - Kamer Sokak No: 12/1
    Küçüksu Kandilli 34684
    Üsküdar/İstanbul, TÜRKİYE

    Popular

    • Check back soon...

    Newsletter

    Subscribe to our daily briefing and never miss a headline from the maritime world.

    You can unsubscribe at any time. Privacy Policy

    © 2025 SeaNews Turkey. All rights reserved.