The 'Zeus', while loading at the port of Patras Rio, suffered a mechanical damage due to the loss of electric power in the morning of Aug 5, 2018
The 'Zeus', while loading at the port of Patras Rio, suffered a mechanical damage due to the loss of electric power in the morning of Aug 5, 2018. Subsequently, the port authority detained the vessel in port until repairs were completed. Following an inspection by port engineers, the vessel was issued with a class maintenance certificate and was permitted to leave port and resume the schedule to Andirrion.






