THE US Port Houston has completed the dredging of the Bayport Terminal, deepening the channel depth to 48.5 feet to allow vessel drafts of 45 feet. The improvement works facilitate the heavier loading of ships with containers of heavy cargoes such as synthetic resins.
[ARCHIVED]
