SeaNews Türkiye - Maritime Intelligence
    shipbuilding

    MPI Dorothea Gets MaXcess System

    December 24, 2012
    SeaNews
    5,628 views
    Share:
    MPI Dorothea Gets MaXcess System

    MPI’s wind-turbine-maintenance vessel, MPI Dorothea, has recently been equipped with the Maxcess T12 system.

    MPI’s wind-turbine-maintenance vessel, MPI Dorothea, has recently been equipped with the Maxcess T12 system. The vessel’s charterer, Scira, ordered the system earlier this year with the aim of enhancing safety and transfer performance on board MPI Dorothea. The Maxcess system connects to the turbine, ensuring a stable platform for transfer. Scira currently charters two identical 18m South Boats, operated by MPI Workboats, for the transfer of Siemens’ technicians involved in O&M activities. A comparison of transfer performance between the two vessels and an assessment of reliability of the Maxcess system is planned for the coming months. Scira estimates that if it can increase access from its current average of 1.1m to 1.8m wave height, it will achieve an increase of 40% in working time. This should ensure that Scira’s operations are not only safer, but significantly more effective with the introduction of Maxcess to its O&M activities. The vessel is due to start operations at Scira’s Sheringham Shoal site in the coming days.

    © Copyright SeaNews

    Comments (0)

    Leave a Comment

    Your comment will be reviewed before publishing.

    SeaNews Türkiye - Maritime Intelligence

    The leading source for global maritime news, shipping intelligence, and logistics analysis. Connecting the oceans of information.

    Lojiturk - Kamer Sokak No: 12/1
    Küçüksu Kandilli 34684
    Üsküdar/İstanbul, TÜRKİYE

    Popular

    • Check back soon...

    Newsletter

    Subscribe to our daily briefing and never miss a headline from the maritime world.

    You can unsubscribe at any time. Privacy Policy

    © 2025 SeaNews Turkey. All rights reserved.