The crew of the 'Cape Dawson' observed an inconsistency in the main engine remote control operations during a pre-arrival test at Montreal on June 6, 2018, but the back up system was fully operational
The crew of the 'Cape Dawson' observed an inconsistency in the main engine remote control operations during a pre-arrival test at Montreal on June 6, 2018, but the back up system was fully operational. The decision was taken to stop the vessel and to finalize system-checks to full Class satisfaction. This was not an emergency situation, but part of normal routine.






