THE Chittagong Port Authority has enlisted the help of the Bangladesh army to speed up the construction of the Patenga Container Terminal (PCT) that is scheduled for completion by mid-2019 at a cost of US$234.1 million, in an effort to ease severe congestion in the harbour.
[ARCHIVED]
