SeaNews Türkiye - Maritime Intelligence
    ports

    Building of Singapore's new Changi East air terminal to start in 2020

    SeaNews
    2,607 views
    Share:
    Building of Singapore's new Changi East air terminal to start in 2020
    Archive Photo

    CONSTRUCTION of Terminal 5, Singapore's new passenger terminal, will commence in 2020

    CONSTRUCTION of Terminal 5, Singapore's new passenger terminal, will commence in 2020. The terminal that is part of the sprawling 1,080-hectare Changi East complex will be located alongside the existing airport. Changi East covers an area equivalent to 667 football fields put together, with onsite drainage as long as 435 mass railway transit trains. The new complex will be manned by 20,000 workers compared to 3,000 currently at the existing Changi airport.

    Changi East will also encompass the Changi East industrial zone, aircraft support facilities, a three-runway system, as well as tunnels and underground systems, The Independent, Singapore reported.

    The Changi East industrial zone will raise the cargo handling capabilities of Changi Airport from its current capacity of three million tonnes per year, to 5.4 million tonnes annually upon completion by 2030. In addition, the Changi airfreight centre will be upgraded to boost capability.

    Concentrating on automation, the air cargo hub will be able to accelerate the speed and efficiency of cargo delivery through the utilisation of technology and data.

    Changi East also has its own checkpoint, which has six lanes and can handle 500 vehicles and 8,000 workers per hour. It was launched in September for keeping track of vehicular and human activity going in and out of the area.

    Additionally, there is also the Changi East command centre (CECC) whose purpose is to provide safety monitoring in the airfield. Electronic tracking equipment and video surveillance systems will ensure the wellbeing of employees. Each worker will be given a transponder and virtual fences will be set up. When a worker inadvertently enters a restricted area, alarms will sound.

    Construction of Terminal 5 is expected to be finished by 2030 when the facility will be able to accommodate up to 50 million people every year in its first phase. It will be connected to the other terminals in Changi to facilitate smooth transfers between terminals.

    © Copyright SeaNews

    Comments (0)

    Leave a Comment

    Your comment will be reviewed before publishing.

    SeaNews Türkiye - Maritime Intelligence

    The leading source for global maritime news, shipping intelligence, and logistics analysis. Connecting the oceans of information.

    Lojiturk - Kamer Sokak No: 12/1
    Küçüksu Kandilli 34684
    Üsküdar/İstanbul, TÜRKİYE

    Popular

    • Check back soon...

    Newsletter

    Subscribe to our daily briefing and never miss a headline from the maritime world.

    You can unsubscribe at any time. Privacy Policy

    © 2025 SeaNews Turkey. All rights reserved.