Reklam
Reklam
Reklam
Reklam
Reklam
Reklam

Salvage operations resumed

The operations to refloat the 'Betanzos' off Bugio at the mouth of the Tagus, were resumed on March 12 around 9 a

Salvage operations resumed

The operations to refloat the 'Betanzos' off Bugio at the mouth of the Tagus, were resumed on March 12 around 9 a

Salvage operations resumed
12 March 2018 - 12:56

The operations to refloat the 'Betanzos' off Bugio at the mouth of the Tagus, were resumed on March 12 around 9 a.m. Six members of Smit Salvage will prepare cables on board, and four crew members arrived at 8:30 a.m. at the Montijo Air Base, and then a helicopter was to be deployed by the Air Force to take them aboard the ship. Afterwards preparation work was to start to receive the tow ropes from the tugs. The sea state had improved, but was still rough. Spanish report with photos: https://www.cmjornal.pt/p...

This news 1527 hits received.

COMMENTS

  • 0 Comment