Cochin portshipbuildingproject sees good responseGulf TimesThe firm which will build and operate the facility can also undertakeshipbuilding, he said. The facility, with a capacity to handle ships with an overall length of 130 metres, breadth of 25 metres and the maximum lightweight in the dry dock position...
SHIPBUILDING
16 August 2012 - 20:05
Cochin port shipbuilding project sees good response - Gulf Times
Cochin portshipbuildingproject sees good responseGulf TimesThe firm which will build and operate the facility can also undertakeshipbuilding, he said. The facility, with a capacity to handle ships with an overall length of 130 metres, breadth of 25 metres and the maximum lightweight in the dry dock position...
SHIPBUILDING
16 August 2012 - 20:05
This news 1231 hits received.
These news may also interest you