Reklam
Reklam
Reklam
Reklam
Reklam

Bulkcarrier refloated after more than two weeks

The 'Harriett' was refloated in the morning of March 31 by own means and anchored near the grounding site for surveys

Bulkcarrier refloated after more than two weeks

The 'Harriett' was refloated in the morning of March 31 by own means and anchored near the grounding site for surveys

Bulkcarrier refloated after more than two weeks
01 April 2018 - 13:49

The 'Harriett' was refloated in the morning of March 31 by own means and anchored near the grounding site for surveys. Underwater surveys carried out earlier did not show hull damages as the ship had grounded on sandy bottom near Mudyug island in the night of March 14 shortly after leaving Arkhangelsk port with 20.000 tons of coal on board, destined for Terneuzen.

This news 1502 hits received.

COMMENTS

  • 0 Comment