A ground-breaking ceremony for the new Hamina LNG terminal that is to be engineered, procured and constructed by Wärtsilä was held on September 25. The ceremony was attended by Finland’s Minister of Finance Mr Petteri Orpo, as well as local officials and executives from Hamina LNG Oy and Wärtsilä. The 30,000 m3 capacity terminal will provide storage of liquefied natural gas (LNG). It will also have re-gasification capability for sending the gas to the existing distribution network serving both regional and national markets. In addition, the terminal will have a truck-loading area for LNG, as well as the possibility to supply bunkering barges and small-scale carriers. The tank foundation for the terminal has already been cast, and the facility is scheduled to become fully operational in 2020.
WORLD SHIPPING
28 September 2018 - 11:35
Ground-breaking ceremony held for Wärtsilä built Hamina LNG terminal
A ground-breaking ceremony for the new Hamina LNG terminal that is to be engineered, procured and constructed by Wärtsilä was held on September 25
WORLD SHIPPING
28 September 2018 - 11:35
This news 2035 hits received.
EDITOR
SEANEWS TURKEY MARITIME NEWS FROM THE WORLD AND TURKEY
These news may also interest you