TurkishMaritimeNews
Home FAQ RSS Links Site Map Contact Sunday, 26.May.2013, 10:38 (GMT+3)
All News
COLUMNISTS
   » CAHIT ISTIKBAL
   » NILUFER ORAL
   » STEVE PELECANOS
   » SULEYMAN SAVAS
WORLD SHIPPING
SHIPPING NEWS
   » TURKISH STRAITS
   » ENERGY
      » Pipelines
   » CONTAINER
   » PORTS
      » HELLENIC SHIPPING NEWS
   » CRUISE NEWS
   » PILOTAGE&TOWAGE
   » SAFETY&SECURITY
   » Environmental
   » Towage & Salvage
   » NAVY NEWS
   » Fishing
   » TANKERS
   » DRY BULK
SHIPBUILDING
ACCIDENTS
MARKETS
LOGISTICS
DEMOLITION
IMO&EU NEWS
PIRACY
TURKISH PRESS REVIEW
SEA SPORTS
NEWS FROM TURKEY
   » Anatolian Agency
   » Hurriyet Daily News
   » HDAILYNEWS
LLOYD'S LIST
INSIGHT/OPINION
SHIPBROKER REPORTS
Poll
What you expect from freight market in 2013?
Better than 2012.
Worse than 2012.
Continue recovering.
Steady up.
Rapid rise.
None


 
WORLD SHIPPING


Australia: BAE Systems Completes Mast Modules for LHD Superstructure

Australia: BAE Systems Completes Mast Modules for LHD Superstructure

Mast modules for the 27,000 tonne Landing Helicopter Dock (LHD), fabricated and constructed at BAE Systems Henderson, facility are now completed and ready to be transported to Melbourne. The three mast modules weighing between 19 and 36 tonnes will form part of the superstructure of the LHDs and will house equipment including communication and combat systems, navigation and air traffic control radars and infrared search and track sensors.
Wednesday, 06.Jun.2012, 14:08 (GMT+3)

Mast modules for the 27,000 tonne Landing Helicopter Dock (LHD), fabricated and constructed at BAE Systems Henderson, facility are now completed and ready to be transported to Melbourne. The three mast modules weighing between 19 and 36 tonnes will form part of the superstructure of the LHDs and will house equipment including communication and combat systems, navigation and air traffic control radars and infrared search and track sensors.

The mast modules will be loaded onto the heavy lift ship Henan Scan berthed at BAE Systems wharf at their Henderson load-out facility. The vessel will leave the load-out facility tomorrow and is scheduled to arrive in Williamstown the following Monday, weather dependent.

The mast modules will then be consolidated together with the superstructure being constructed at BAE Systems Williamstown. The superstructure together with the masts, and all the control, combat and communications systems, will be installed, integrated and tested at the BAE Systems Williamstown shipyard.

Director of Maritime for BAE Systems, Bill Saltzer, said the manufacture, outfit, blast and paint works on these three mast modules began last September.

“It was decided to construct the mast modules at the Henderson facility because of its proven track record for fabricating vessel masts for the Royal Australian Navy and by keeping the superstructure build on BAE Systems sites we can ensure consistent quality in the LHD project. Also with the amount of work currently being undertaken at the Williamstown yard, with two major projects, it made sense to utilise our workshops and personnel in Western Australia. Complete with its own 6,000 tonne load-out facility, our Henderson site sits on 14.5 hectares with direct waterfront access and has the facilities, capacity and technical capability to accommodate this part of the build,” he said.

BAE Systems is the prime contractor for the LHD Project. The first hull which is being constructed in Ferrol Spain is expected to arrive in Williamstown in the fourth quarter 2012.

Mr Saltzer said BAE Systems had also commenced phase one of a major upgrade to the Henderson facility.

“The upgrade to the site includes expansion of the existing rail system which will allow more capacity for ship dry-dockings along with a number of other facility improvements to enhance the overall working environment. Upgrading this well-located waterfront facility will put us in a prime position to secure future opportunities within Western Australia, both in the naval and commercial markets” he said.


Read: 1287 Times- BAE Systems, LHD Superstructure, -


Rating (Votes: 0)
Add your comment(Existing: 0)  Tell friend  Print

COMMENTS ( 0 Existing)

Related Articles:



Other Articles:
Posidonia 2012: Shipping Embraces Innovative Technologies to Tow Itself Forward (Greece) (Wednesday,06.06.2012)
U.S. Navy Charters MV Kellie Chouest (Wednesday,06.06.2012)
Japan: Mitsubishi’s ‘Air-Carpet’ for AIDA Cruise Ships (Wednesday,06.06.2012)
Damen – CSD500 Dredgers Almost Ready at Cape Town Shipyard (South Africa) (Wednesday,06.06.2012)
GOP Discusses Proposed ‘STOLT VALOR’ Passage to Bahrain (Wednesday,06.06.2012)
DSNS Inks Contract for Construction of SIGMA PKR for Indonesian Navy (Wednesday,06.06.2012)
Braemar Howells and Braemar Launch New Salvage Support Operation (UK) (Wednesday,06.06.2012)
Russian-Flagged Trawler Kapitan Laskov Refloated (Wednesday,06.06.2012)
Poland: Remontowa Christens PSV Lewek Aquarius (Wednesday,06.06.2012)
Norway: Island Offshore Takes Delivery of MV Island Crusader (Wednesday,06.06.2012)





Events
May 2013
Su Mo Tu We Th Fr Sa
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  
 

News in Pictures


Big Yellow bird taking off as big blue EBBA MAERSK is coming into Port of Rotterdam


Hot News
Nexo Maersk polluted port of Valencia with oil
Hapag-Lloyd Launches New Levante Express Service
Hamburg SĂŒd : “Best Green Service Provider”
Pocket guide focuses on safe carriage of solid bulk cargoes
Genscape Buys Vesseltracker.com
Maersk charters seventh Hyundai-built 6,673-TEUer from Technomar
PIL launches second Far East-Red Sea loop using seven containerships
Cosco to beef up transpacific CEN service with Evergreen, Wan Hai
UK: Transas Unveils New Version of ShipGuard
Boxes or WTO? Study shows boxes were biggest trade contributor

 
Archive Search