SeaNews Turkey
Home FAQ RSS Links Site Map Contact Wednesday, 30.Jul.2014, 00:56 (GMT)
All News
INTERVIEW
TURKISH STRAITS
SEANEWS MAGAZINE
COLUMNISTS
WORLD SHIPPING
PORTS
SHIPPING NEWS
SHIPBUILDING
ACCIDENTS
PILOTAGE&TOWAGE
MARKETS
LOGISTICS
SHIP RECYCLING
IMO&EU NEWS
PIRACY
TURKISH PRESS REVIEW
SEA SPORTS
NEWS FROM TURKEY
INSIGHT/OPINION
SHIPBROKER REPORTS
OFFSHORE
GUEST COLUMNIST
MARITIME RSS
Poll
Will freight markets ever return pre-crisis levels?
Yes, in 2014
Yes, in 2015
Yes, after 2015
No, never!
Who knows?
Get Adobe Flash player


 
WORLD SHIPPING

Chongqing to build five port projects this year to magnify capacity
Chongqing to build five port projects this year to magnify capacity


CHONGQING is to start building five port projects this year, including Foeryan terminal phase 2, Wanzhou Xintian port area logistics park phase 1, Fuling port area Longtoushan terminal phase 1, Shizhu port area Jiangjiacao terminal phase 1, Yongchuan port area Zhutuo operation area phase 1
Friday, 20.Apr.2012, 20:37 (GMT)

CHONGQING is to start building five port projects this year, including Foeryan terminal phase 2, Wanzhou Xintian port area logistics park phase 1, Fuling port area Longtoushan terminal phase 1, Shizhu port area Jiangjiacao terminal phase 1, Yongchuan port area Zhutuo operation area phase 1

Foeryan terminal phase 2, Wanzhou Xintian port area logistics park phase 1 and Fuling port area Longtoushan terminal phase 1 will start construction within this year, according to Xinhua's report.

Wanzhou Xintian port area is one of a container and bulk transit hub on the upper Yangtze River and offers rail-river or road-river intermodal service. The first phase of the port area includes building five multi-use berths, bringing a 475,000 TEU or 6.6 million tonnes' capacity to the port.

The Foeryan terminal phase 2 project includes two 3,000-tonne bulk berths with a capacity of 1.74 million tonnes. Fuling port area' Longtoushan terminal phase 1 project includes five 5,000-tonne bulk berths with a capacity of six million tonnes.

Shizhu port area phase 1 terminal, which has a capacity of three million tonnes, and the Yongchuan port area Zhutuo operation area phase 1, which has a capacity of 1.8 million tonnes, will finish the feasibility report and apply for approval this year.


Read: 1458 Times- CHONGQING, -


Rating (Votes: 0)
Add your comment(Existing: 0)  Tell friend  Print

COMMENTS ( 0 Existing)

Related Articles:







Events
July 2014
Su Mo Tu We Th Fr Sa
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    
 

COLUMNISTS
MOST READ TODAY
Turkish ship Perge rescues 112 Libyan refugees off Tripoli- 452
Bulk Grain Carrier Federal Rideau Aground in Lake St. Claire- 386
M/V MAGNUM had engine breakdown in Istanbul Strait- 374
HPH Trust first half profit up 16pc to US$119.6 million, revenues up 2pc- 312
Launch of the Maritime pilot phase of the Single Window for Foreign Trade in Togo- 310
Tanker with Northern Iraqi crude cleared to unload cargo off Texas- 275
Costa Concordia Changes Hands- 262
Hamburg, Rotterdam face congestion charges as dwell times stretch- 237
Maersk-MSC's 2M suffers poor reviews from CCTV documentary report- 222
Reliability deteriorates as box carriers cut costs, keep rates low- 194

E-MAGAZINE
SeaNews June
October Issue
SeaNews June
September Issue
SeaNews June
July/August Issue
SeaNews June
June Issue
SeaNews June
May Issue

News in Pictures


Model Alexandra Fotopoulou holding the 9th issue of seanews magazine at the Posidonia Shipping Fair


Hot News
Asia-South America cargo surge as average ship size rises to 6,200 TEU
Videotel warns of perils of shipboard smart phones and social media
Evergreen ups Dublin, Liverpool-Rotterdam services
Asia exports fall on weaker demand, China property market a worry
Turkish ship Perge rescues 112 Libyan refugees off Tripoli

 
Archive Search