Shortly before 13:30 completed the safe mooring of Ro / Ro COLOSSUS of NEL LINES which arrived at the port of Patras trailer from Lefkada.
After the adventure is over, the ship "Colossus" detached from the bay of Vassiliki where he stayed for two days after the accident Wednesday. With the help of two tugs were rushing from Patras, the ship became detached and began his journey to Patras, where he arrived to be repaired.
Λευκάδας. The company detachment began yesterday afternoon and throughout the duration of supervised work the Coast of Lefkada. Moreover, vessels carrying cement to the spot to repair the damage drafts that had caused the ship's watertight.