Croatia: Inauguration Ceremony for Viktor Lenac’s New Floating Drydock
On Friday 20th July 2012, Viktor Lenac Shipyard held a ribbon
cutting ceremony for the FLOATING DRYDOCK RI-38. In November 2011,
Viktor Lenac signed the contract for the purchase of a new floating
drydock with the Ukraine shipyard Kherson State Plant „Pallada“. The new
dock was delivered in June 2012. Wednesday, 25.Jul.2012, 23:18 (GMT+3)
On Friday 20th July 2012, Viktor Lenac Shipyard held a ribbon
cutting ceremony for the FLOATING DRYDOCK RI-38. In November 2011,
Viktor Lenac signed the contract for the purchase of a new floating
drydock with the Ukraine shipyard Kherson State Plant „Pallada“. The new
dock was delivered in June 2012.
It is a composite dock type with concrete pontoons and steel towers having the following dimensions:
Pontoon Length: 139.50 m
Length Overall: 155.50 m
B (internal clear between towers): 24.50 m
Overall Width: 32.40 m
Capacity: 8,500 t
The new dock will focus on small to medium sized ships, particularly
chemical tankers, LPG, ferry boats and cruisers, general cargo and
container ships and offshore support vessels conversions. The shipyard
now has three floating drydocks. Dock 11 is the largest dock and can
receive vessels of Aframax and Suezmax size. Dock 5 has recently been
completely renovated.
With the third dock, the shipyard will increase its docking capacity
allowing flexibility in accommodating small to medium sized ships and
freeing up large dock capacity.